Commercial Gas Boiler Price Guide 2026

An honest price basis for the TBLN condensing range — from USD 25 per kW, EXW China — what is inside it, what moves the final number, and how to get a firm quote in 48 hours.

Almost every boiler website hides behind "request a quote", which tells a project engineer nothing about whether the equipment can fit the budget at all. This page does the opposite: it publishes the price basis we actually quote against, states exactly what is inside and outside it, and explains which variables move the final number. If after reading it the economics do not work for your project, you will know that before writing to us — and so will we.

Belitto is a heating system supply chain manager, not a trader reselling stock. Condensing boilers come from a Jiuxu facility operating under ISO 9001; heat exchange equipment from Sanming. One quality standard, one document set, one after-sales contact. The pricing below is for the TBLN condensing gas hot-water range, 60–2,800 kW, with the price basis applying from 350 kW upward.

The price basis: from USD 25 per kW, EXW China

from USD 25 per kW (EXW China, 2026 indicative pricing)

Applies to standard-config TBLN condensing gas hot-water boilers, 350–2,800 kW. Final quotation within 48 hours based on your capacity, gas parameters and site conditions; the offer is firm for 30 days once the model and options are fixed.

A price basis is a calculation floor for budgeting — not a binding offer. See what it includes and excludes below.

Included in this price basis

  • Boiler body with heat exchanger
  • Gas burner
  • Ignition system
  • Control system
  • Fan
  • Gas valve train
  • Boiler casing

Not included

  • Transport, insurance, export clearance
  • Installation and commissioning
  • Economizer and flue system
  • Pumps and external piping
  • Import duties and local certification fees

If you specify a preferred burner brand, we quote that configuration separately — price on request.

What the basis means in practice

Plant loadArithmetic on the basisReality check
350 kW (hotel, school block) from USD 8,750 Small units sit closest to the floor; options move the number the most in relative terms
700 kW (food plant DHW + heating) from USD 17,500 Typical first-order size for a single building
1,400 kW (cascade unit, our most-shipped size) from USD 35,000 per unit The size of every unit in the Ningxia 8,400 kW cascade
2,800 kW (district heating block) from USD 70,000 Best per-kW economics of the standard range

These figures are arithmetic on the USD 25/kW price basis — EXW, standard configuration, before options, freight and duties. They are for budgeting, not an offer.

What moves the final price

VariableEffect on the numberWhat we need from you
Capacity and unit count Per kW falls as the unit grows; a cascade of smaller units prices differently than one large boiler at the same total output Peak load in kW and whether redundancy (N+1) is required
Burner selection The standard configuration ships with the burner we set and test at the factory; a buyer-specified burner brand is quoted separately Whether your project fixes the burner brand, and any NOx limit the permit requires
Emission requirements NOx ≤30 mg/m³ with the low-NOx burner is available; re-permitted city boiler houses usually need it The emission limit in your project documentation, if any
Gas parameters Low or unstable supply pressure, or unusual calorific value, can add a gas train, regulator or booster Lower calorific value, Wobbe index and guaranteed inlet pressure from the gas contract
Certification route EAC certification for EAEU markets can be arranged on request and is priced per project; Uzbekistan's national route is arranged by the importer with our technical file The destination country and who holds the certificate
Incoterm EXW is the floor; FCA, CFR and DAP add freight, insurance and clearance. DAP is the usual choice for a first project Delivery term and site city, so the logistics leg is quoted on real rates

Why we publish a price basis instead of a price list

A price list would be false precision: the same 1,400 kW boiler can legitimately quote 30% apart depending on the burner, the emission requirement and the delivery term. A price basis is different — it is the number we actually calculate from, published so that a project engineer can test the economics before spending a week on correspondence.

It also filters both ways. If the basis is far below what a European-brand line item in your CAPEX assumed, that is useful to know early. If your budget cannot reach even the basis plus freight, we would rather you learned it here than after we both invested in drawings. And when the quote arrives, you will be able to see which of the variables above moved the number, because the proposal itemises them.

The price of the boiler is not the cost of the heat

For a boiler that runs fifteen to twenty-five years, the purchase price is a minority of what you will spend. Fuel is typically the dominant share of lifecycle cost, which is why the efficiency claim on the datasheet deserves scrutiny rather than a nod: a condensing boiler only delivers its condensing efficiency when the return water is cold enough, and a 70/50 °C circuit quietly converts it into a conventional boiler. We put this in writing before you buy, not after.

If you are comparing offers, compare them at the same efficiency reference (LHV or HHV), the same NOx class and the same incoterm — otherwise the cheaper number is usually the thinner specification. Our condensing technology overview and the boiler cycling analysis cover the operating-side effects in detail.

For products outside the price basis: TBYG 3,500–7,000 kW units are engineered per project, and plate heat exchangers and heating substations are quoted with the hydraulic scheme.

Get your firm price in 48 hours

Send the capacity, the flow and return temperatures, the site city and the delivery term. You get a technical proposal with an itemised price — not a number scrawled on a brochure.

Request a Quote

Related: TBLN 60–2,800 kW condensing boilers  ·  TBYG 3,500–7,000 kW  ·  Projects in Uzbekistan  ·  Cascade N+1 design guide

Frequently Asked Questions

The questions buyers ask about price, scope and how firm any of it is.

What does a TBLN condensing gas boiler cost?+

Indicative 2026 pricing starts from USD 25 per kW on EXW terms for standard configurations of 350–2,800 kW. This price basis includes the boiler body with heat exchanger, gas burner, ignition system, control system, fan, gas valve train and boiler casing. Transport, installation, economizer and flue systems are quoted separately. Send your capacity and site parameters for a final quotation within 48 hours.

Why from USD 25 per kW and not a fixed price?+

Because the equipment price is a basis, not a quote. Per kW the hardware gets cheaper as the unit gets bigger, and the final number moves with the burner and control options, the certification route and the incoterm. The 25 USD/kW figure is the honest floor for a standard configuration so you can budget the project; the binding number arrives with the technical proposal, and once the model and options are fixed the offer is firm for 30 days.

Does USD 25 per kW include installation and delivery?+

No. The basis is EXW China: you get the complete boiler with burner, ignition, control system, fan, gas valve train and casing, ex works. Transport, insurance, export clearance, installation and commissioning, and the economizer and flue system are quoted separately, either as FCA, CFR or DAP delivery to your site. Most first-time buyers take DAP because freight and transit risk stay on our side.

Can I specify my own burner brand?+

Yes. The standard configuration ships with the burner we set and test at the factory. If your project requires a specific burner brand, we quote that configuration separately — price on request. The same applies to low-NOx versions and special gas or pressure parameters: all of it is possible, it just does not fit inside a single per-kW figure.

Does the price change with boiler capacity?+

Yes, and in your favour as the unit grows. Per kW, hardware gets cheaper with size: a 2,800 kW unit costs meaningfully less per kW than a 350 kW one. The USD 25 per kW figure is the floor across the standard 350–2,800 kW range; the exact per-model figure comes with the quotation. For 3,500–7,000 kW TBYG units, pricing is engineered per project.

How firm is the quotation?+

The budget price arrives with the technical proposal, typically within 48 hours of receiving your load, temperatures and site data. Once the model, options and incoterm are fixed, the offer is firm for 30 days. Freight and certification costs are confirmed at the time of quotation, because both move with the market.

Is the warranty included in this price?+

Yes. Every unit ships with a 12-month warranty from commissioning or 18 months from delivery, whichever comes first, covering the complete unit including all components. Factory test reports for each boiler, ISO 9001 certification of the manufacturing facility and CE certificates for the bought-in components (Bekaert, Dungs, EBM, Siemens, SIT) are part of the standard document set — no extra charge.

Why is this price lower than European brands?+

Because the boiler comes from a Jiuxu manufacturing facility operating under ISO 9001 in China, supplied through Belitto as the supply chain manager — not because the specification was quietly reduced. European components are inside the price basis: Bekaert heat exchanger, Dungs and EBM gas and air components, Siemens and SIT controls, each with its own certificate. What you give up versus a European brand is local service density, not the pressure vessel, the burner or the controls.