Almost every boiler website hides behind "request a quote", which tells a project engineer nothing about whether the equipment can fit the budget at all. This page does the opposite: it publishes the price basis we actually quote against, states exactly what is inside and outside it, and explains which variables move the final number. If after reading it the economics do not work for your project, you will know that before writing to us — and so will we.
Belitto is a heating system supply chain manager, not a trader reselling stock. Condensing boilers come from a Jiuxu facility operating under ISO 9001; heat exchange equipment from Sanming. One quality standard, one document set, one after-sales contact. The pricing below is for the TBLN condensing gas hot-water range, 60–2,800 kW, with the price basis applying from 350 kW upward.
The price basis: from USD 25 per kW, EXW China
from USD 25 per kW (EXW China, 2026 indicative pricing)
Applies to standard-config TBLN condensing gas hot-water boilers, 350–2,800 kW. Final quotation within 48 hours based on your capacity, gas parameters and site conditions; the offer is firm for 30 days once the model and options are fixed.
A price basis is a calculation floor for budgeting — not a binding offer. See what it includes and excludes below.
Included in this price basis
- Boiler body with heat exchanger
- Gas burner
- Ignition system
- Control system
- Fan
- Gas valve train
- Boiler casing
Not included
- Transport, insurance, export clearance
- Installation and commissioning
- Economizer and flue system
- Pumps and external piping
- Import duties and local certification fees
If you specify a preferred burner brand, we quote that configuration separately — price on request.
What the basis means in practice
| Plant load | Arithmetic on the basis | Reality check |
|---|---|---|
| 350 kW (hotel, school block) | from USD 8,750 | Small units sit closest to the floor; options move the number the most in relative terms |
| 700 kW (food plant DHW + heating) | from USD 17,500 | Typical first-order size for a single building |
| 1,400 kW (cascade unit, our most-shipped size) | from USD 35,000 per unit | The size of every unit in the Ningxia 8,400 kW cascade |
| 2,800 kW (district heating block) | from USD 70,000 | Best per-kW economics of the standard range |
These figures are arithmetic on the USD 25/kW price basis — EXW, standard configuration, before options, freight and duties. They are for budgeting, not an offer.
What moves the final price
| Variable | Effect on the number | What we need from you |
|---|---|---|
| Capacity and unit count | Per kW falls as the unit grows; a cascade of smaller units prices differently than one large boiler at the same total output | Peak load in kW and whether redundancy (N+1) is required |
| Burner selection | The standard configuration ships with the burner we set and test at the factory; a buyer-specified burner brand is quoted separately | Whether your project fixes the burner brand, and any NOx limit the permit requires |
| Emission requirements | NOx ≤30 mg/m³ with the low-NOx burner is available; re-permitted city boiler houses usually need it | The emission limit in your project documentation, if any |
| Gas parameters | Low or unstable supply pressure, or unusual calorific value, can add a gas train, regulator or booster | Lower calorific value, Wobbe index and guaranteed inlet pressure from the gas contract |
| Certification route | EAC certification for EAEU markets can be arranged on request and is priced per project; Uzbekistan's national route is arranged by the importer with our technical file | The destination country and who holds the certificate |
| Incoterm | EXW is the floor; FCA, CFR and DAP add freight, insurance and clearance. DAP is the usual choice for a first project | Delivery term and site city, so the logistics leg is quoted on real rates |
Why we publish a price basis instead of a price list
A price list would be false precision: the same 1,400 kW boiler can legitimately quote 30% apart depending on the burner, the emission requirement and the delivery term. A price basis is different — it is the number we actually calculate from, published so that a project engineer can test the economics before spending a week on correspondence.
It also filters both ways. If the basis is far below what a European-brand line item in your CAPEX assumed, that is useful to know early. If your budget cannot reach even the basis plus freight, we would rather you learned it here than after we both invested in drawings. And when the quote arrives, you will be able to see which of the variables above moved the number, because the proposal itemises them.
The price of the boiler is not the cost of the heat
For a boiler that runs fifteen to twenty-five years, the purchase price is a minority of what you will spend. Fuel is typically the dominant share of lifecycle cost, which is why the efficiency claim on the datasheet deserves scrutiny rather than a nod: a condensing boiler only delivers its condensing efficiency when the return water is cold enough, and a 70/50 °C circuit quietly converts it into a conventional boiler. We put this in writing before you buy, not after.
If you are comparing offers, compare them at the same efficiency reference (LHV or HHV), the same NOx class and the same incoterm — otherwise the cheaper number is usually the thinner specification. Our condensing technology overview and the boiler cycling analysis cover the operating-side effects in detail.
For products outside the price basis: TBYG 3,500–7,000 kW units are engineered per project, and plate heat exchangers and heating substations are quoted with the hydraulic scheme.
Get your firm price in 48 hours
Send the capacity, the flow and return temperatures, the site city and the delivery term. You get a technical proposal with an itemised price — not a number scrawled on a brochure.
Request a QuoteRelated: TBLN 60–2,800 kW condensing boilers · TBYG 3,500–7,000 kW · Projects in Uzbekistan · Cascade N+1 design guide